Vistanut

Vistanut International

Premium Cashews
verifiedPanruti Cashew Processing Plant • 1,200+ MT Annual Capacity • sailingDirect Feeder Sailings from Tuticorin, Chennai & Nhava Sheva to 35+ Global Ports • handshakeZero Middleman • Direct Processing House Contract Rates
Home / Processing Journey
Engineered Excellence · 100% Mechanized Pipeline

Our Mechanized Cashew Processing Workflow

Visual breakdown of our industrial cashew processing pipeline from farmgate orchard harvest to nitrogen vacuum packaging. Click on any stage card to inspect machine calibrations, thermal parameters, and QA protocols.

touch_app Click any card for technical popup
alt_route

Total Workflow

11 Sequential Stages

scale

KOR Quality

48 - 52 lbs / Bag

thermostat

Thermal Boiling

90°C Micro-Pressure

verified

Whole Kernel Yield

>94% Intact Recovery

Phase 1: Raw Nut Inflow, Thermal Conditioning & Shelling (Stages 01 – 05)

Harvesting STAGE 01 KOR 48-52
visibility View Specs

1. Harvesting

Raw cashew nut orchard harvesting with mandatory KOR sampling cut-tests.

Inspect Details arrow_forward
Sun Drying STAGE 02 7% - 8% Moist
visibility View Specs

2. Sun Drying

Vibratory destoning, debris separation, and 72-hour solar moisture conditioning.

Inspect Details arrow_forward
Steaming STAGE 03 90°C Steam
visibility View Specs

3. Steaming

Micro-pressure steam tanks safely softening outer hull & isolating CNSL liquid.

Inspect Details arrow_forward
Shelling STAGE 04 >94% Whole
visibility View Specs

4. Shelling

Dual-blade motorized cracking machines extracting intact whole cashew kernels.

Inspect Details arrow_forward
Drying STAGE 05 70°C / 24h
visibility View Specs

5. Drying

Controlled 70°C hot-air desiccation loosening the reddish testa skin for peeling.

Inspect Details arrow_forward
↓ Pipeline Progression: Primary Shelling & Drying Complete
Proceeding to Cooling, Peeling, Color Sorting, Grading & Packaging arrow_forward

Phase 2: Cooling, Refining, Sorting & Export Packaging (Stages 06 – 11)

Cooling STAGE 06 Stabilization
Inspect

6. Cooling

Controlled ambient airflow cooling to room temperature, loosening outer testa skin.

View Specs arrow_forward
Peeling STAGE 07 Airjet Testa
Inspect

7. Peeling

Pneumatic vortex airjets strip outer testa skin cleanly without chemicals.

View Specs arrow_forward
Color Sorting STAGE 08 12k Kernels/s
Inspect

8. Color Sorting

CCD cameras inspecting 12,000 nuts/sec and blasting defects with optical airjets.

View Specs arrow_forward
Heating & Grading STAGE 09 W180 - W320
Inspect

9. Heating & Grading

Thermal conditioning and precision vibrating caliper sieving into export grades.

View Specs arrow_forward
Final Drying STAGE 10 < 5.0% Moist
Inspect

10. Final Drying

Precision moisture desiccation ensuring moisture < 5.0% prior to packaging.

View Specs arrow_forward
Packing STAGE 11 N2 Flush Tins
Inspect

11. Packing

Nitrogen backflush into 25lb tins & pouches for 24-month freshness.

View Specs arrow_forward
Quality Engineering

The 11-Stage Mechanized Processing Journey

From the raw cashew nut (RCN) tree harvest to hermetically sealed vacuum containers, every step is rigorously calibrated to eliminate contamination and preserve kernel wholeness.

Stage 01

1. Harvesting

Harvested raw cashew nuts arrive from domestic organic farms and accredited West African cooperatives with thorough out-turn (KOR) testing.

1
KOR Spec: 48 - 52 lbs/bag
Stage 02

2. Sun Drying

Rotary sizing drums, high-speed aspirators, and vibrating destoners extract dust, twigs, and stones before entering solar drying and thermal conditioning.

2
Mechanical Vibration Destoning & Solar Stabilization
Stage 03

3. Steaming

Computer-regulated steam pressure tanks soften the resilient outer shell and safely isolate corrosive CNSL liquid from the internal edible nut.

3
90°C Micro-Pressure Boilers
Stage 04

4. Shelling

Mechanized dual-blade cutting machines crack the outer hull cleanly, delivering maximum yield of unbroken, intact whole white kernels.

4
>94% Whole Kernel Recovery
Stage 05

5. Drying

Uniform hot-air circulation chambers slowly dry the kernels at 70°C for 24 hours, stabilizing moisture to exactly 5-6% so the reddish testa skin loosens.

5
Controlled Thermal Desiccation (70°C)
Stage 06

6. Cooling

Kernels rest in laminar airflow cooling bays for 24-36 hours, equilibrating kernel core temperature and crisping the loosened testa skin.

6
Laminar Ambient Aeration
Stage 07

7. Peeling

Specially textured soft rubber rollers combined with pneumatic vortex airjets gently strip away the outer testa without nicking or bruising the kernel.

7
100% Skin Removal Zero Chemical
Stage 08

8. Color Sorting

Advanced bi-chromatic digital CCD cameras inspect 12,000 kernels per second, detecting spots and blemishes with micro-precision pneumatic ejection.

8
Laser & CCD Optical Sizing (12k/sec)
Stage 09

9. Heating & Grading

Gentle thermal heating conditions kernels for vibratory multi-deck sizing screens and illuminated artisan inspection tables classifying AFI grades (W180 - W320, Splits, Pieces).

9
Precision Caliber Size Segregation
Stage 10

10. Final Drying

Controlled post-grading desiccation reduces residual moisture below 5.0%, locking in crunch and shelf stability.

10
Moisture Stabilization < 5.0%
Stage 11

11. Packing

Atmospheric air is evacuated down to 0.5% residual oxygen and refilled with food-grade high-purity nitrogen in 25lb / 50lb tins or EVOH vacuum pouches for 24-month crisp freshness.

11
24-Month Shelf Life Nitrogen Sealing
Global B2B Supply

Ready to Order Bulk Cashew Containers?

We provide full documentation: Phytosanitary, Certificate of Origin, Bill of Lading, and SGS/Eurofins lab reports on request.